Pull Request Policy
In CoreFx we rely on the following policies before a Pull Request (PR) can be merged:
- Every PR needs to be approved by a team member with write access to the repository.
- Unless changes aren't protected by Continuous Integration (CI), e.g. Markdown edits, CI must have run recently, within 7 days unless no commits have been merged. In cases where other PRs have been merged into the same library since CI was run, it is desirable to re-run CI in order to get fresh results and avoid build breaks.
- All defined CI legs on the PR must have run and be green, except when unrelated test failure happened. In rare circumstances, CI may not run, in which case the GitHub green check mark may exist to say that all legs were successful, but only a couple legs actually may have been run and completed; in such cases, PRs must not be merged.
The aforementioned rules apply to both community and team members.
Unrelated test failure
In case CI indicates test failures which are highly unlikely to be caused by changes in the Pull Request, the following actions should be taken:
- An existing issue in the repository should be searched for. Usually the test method's or the test assembly's name (in case of a crash) are good parameters.
- If there's an existing issue, a comment should be placed that includes a) the link to the build, b) the affected configuration (ie
netcoreapp-Windows_NT-Release-x64-Windows.81.Amd64.Open) and c) the Error message and Stack trace. This is necessary as retention policies are in place that recycle old builds. In case the issue is already closed, it should be reopened and labels should be updated to reflect the current failure state. - If there's no existing issue, an issue should be created with the same information outlined above.
- In a follow-up Pull Request, the failing test(s) should be disabled with the corresponding issue number, e.g.
[ActiveIssue(x)], and the tracking issue should be labeled asdisabled-test. - A comment should be placed in the original Pull Request that links to the created or updated issues.
The only time this can be skipped is if the issue is already being investigated, is already reproable locally, is already known to happen on the OS/version on which it failed, and additional ref counts on the issues / additional crash dumps / etc. are definitively known to not be necessary for the developer responsible for the issue. This is relatively rare.
There are plenty of possible bugs, e.g. race conditions, where a failure might highlight a real problem and it won't manifest again on a retry. Therefore these steps should be followed for every iteration of the PR build, e.g. before retrying/rebuilding.
Infrastructure issues
In the event that an infrastructure issue affects the PR build, @dnceng and/or team members should be contacted. Examples of infrastructure issues are CI leg timeouts, repository clone errors, permission denied errors, etc. In addition, the leg should be retried, unless retrying multiple times encounters the same infrastructure issue each time.