linux/kernel/sched/Makefile

22 lines
905 B
Makefile
Raw Normal View History

ifdef CONFIG_FUNCTION_TRACER
CFLAGS_REMOVE_clock.o = -pg
endif
ifneq ($(CONFIG_SCHED_OMIT_FRAME_POINTER),y)
# According to Alan Modra <alan@linuxcare.com.au>, the -fno-omit-frame-pointer is
# needed for x86 only. Why this used to be enabled for all architectures is beyond
# me. I suspect most platforms don't need this, but until we know that for sure
# I turn this off for IA-64 only. Andreas Schwab says it's also needed on m68k
# to get a correct value for the wait-channel (WCHAN in ps). --davidm
CFLAGS_core.o := $(PROFILING) -fno-omit-frame-pointer
endif
sched/deadline: Add SCHED_DEADLINE structures & implementation Introduces the data structures, constants and symbols needed for SCHED_DEADLINE implementation. Core data structure of SCHED_DEADLINE are defined, along with their initializers. Hooks for checking if a task belong to the new policy are also added where they are needed. Adds a scheduling class, in sched/dl.c and a new policy called SCHED_DEADLINE. It is an implementation of the Earliest Deadline First (EDF) scheduling algorithm, augmented with a mechanism (called Constant Bandwidth Server, CBS) that makes it possible to isolate the behaviour of tasks between each other. The typical -deadline task will be made up of a computation phase (instance) which is activated on a periodic or sporadic fashion. The expected (maximum) duration of such computation is called the task's runtime; the time interval by which each instance need to be completed is called the task's relative deadline. The task's absolute deadline is dynamically calculated as the time instant a task (better, an instance) activates plus the relative deadline. The EDF algorithms selects the task with the smallest absolute deadline as the one to be executed first, while the CBS ensures each task to run for at most its runtime every (relative) deadline length time interval, avoiding any interference between different tasks (bandwidth isolation). Thanks to this feature, also tasks that do not strictly comply with the computational model sketched above can effectively use the new policy. To summarize, this patch: - introduces the data structures, constants and symbols needed; - implements the core logic of the scheduling algorithm in the new scheduling class file; - provides all the glue code between the new scheduling class and the core scheduler and refines the interactions between sched/dl and the other existing scheduling classes. Signed-off-by: Dario Faggioli <raistlin@linux.it> Signed-off-by: Michael Trimarchi <michael@amarulasolutions.com> Signed-off-by: Fabio Checconi <fchecconi@gmail.com> Signed-off-by: Juri Lelli <juri.lelli@gmail.com> Signed-off-by: Peter Zijlstra <peterz@infradead.org> Link: http://lkml.kernel.org/r/1383831828-15501-4-git-send-email-juri.lelli@gmail.com Signed-off-by: Ingo Molnar <mingo@kernel.org>
2013-11-28 10:14:43 +00:00
obj-y += core.o proc.o clock.o cputime.o
obj-y += idle_task.o fair.o rt.o deadline.o stop_task.o
obj-y += wait.o completion.o idle.o
obj-$(CONFIG_SMP) += cpupri.o cpudeadline.o
obj-$(CONFIG_SCHED_AUTOGROUP) += auto_group.o
obj-$(CONFIG_SCHEDSTATS) += stats.o
obj-$(CONFIG_SCHED_DEBUG) += debug.o
obj-$(CONFIG_CGROUP_CPUACCT) += cpuacct.o