mirror of
https://github.com/FEX-Emu/linux.git
synced 2024-12-13 20:33:15 +00:00
sched/deadline: Add sched_dl documentation
Add in Documentation/scheduler/ some hints about the design choices, the usage and the future possible developments of the sched_dl scheduling class and of the SCHED_DEADLINE policy. Reviewed-by: Henrik Austad <henrik@austad.us> Signed-off-by: Dario Faggioli <raistlin@linux.it> Signed-off-by: Juri Lelli <juri.lelli@gmail.com> [ Re-wrote sections 2 and 3. ] Signed-off-by: Luca Abeni <luca.abeni@unitn.it> Signed-off-by: Peter Zijlstra <peterz@infradead.org> Link: http://lkml.kernel.org/r/1390821615-23247-1-git-send-email-juri.lelli@gmail.com Signed-off-by: Ingo Molnar <mingo@kernel.org>
This commit is contained in:
parent
b78f4c7c44
commit
712e5e34ae
@ -10,5 +10,7 @@ sched-nice-design.txt
|
||||
- How and why the scheduler's nice levels are implemented.
|
||||
sched-rt-group.txt
|
||||
- real-time group scheduling.
|
||||
sched-deadline.txt
|
||||
- deadline scheduling.
|
||||
sched-stats.txt
|
||||
- information on schedstats (Linux Scheduler Statistics).
|
||||
|
281
Documentation/scheduler/sched-deadline.txt
Normal file
281
Documentation/scheduler/sched-deadline.txt
Normal file
@ -0,0 +1,281 @@
|
||||
Deadline Task Scheduling
|
||||
------------------------
|
||||
|
||||
CONTENTS
|
||||
========
|
||||
|
||||
0. WARNING
|
||||
1. Overview
|
||||
2. Scheduling algorithm
|
||||
3. Scheduling Real-Time Tasks
|
||||
4. Bandwidth management
|
||||
4.1 System-wide settings
|
||||
4.2 Task interface
|
||||
4.3 Default behavior
|
||||
5. Tasks CPU affinity
|
||||
5.1 SCHED_DEADLINE and cpusets HOWTO
|
||||
6. Future plans
|
||||
|
||||
|
||||
0. WARNING
|
||||
==========
|
||||
|
||||
Fiddling with these settings can result in an unpredictable or even unstable
|
||||
system behavior. As for -rt (group) scheduling, it is assumed that root users
|
||||
know what they're doing.
|
||||
|
||||
|
||||
1. Overview
|
||||
===========
|
||||
|
||||
The SCHED_DEADLINE policy contained inside the sched_dl scheduling class is
|
||||
basically an implementation of the Earliest Deadline First (EDF) scheduling
|
||||
algorithm, augmented with a mechanism (called Constant Bandwidth Server, CBS)
|
||||
that makes it possible to isolate the behavior of tasks between each other.
|
||||
|
||||
|
||||
2. Scheduling algorithm
|
||||
==================
|
||||
|
||||
SCHED_DEADLINE uses three parameters, named "runtime", "period", and
|
||||
"deadline" to schedule tasks. A SCHED_DEADLINE task is guaranteed to receive
|
||||
"runtime" microseconds of execution time every "period" microseconds, and
|
||||
these "runtime" microseconds are available within "deadline" microseconds
|
||||
from the beginning of the period. In order to implement this behaviour,
|
||||
every time the task wakes up, the scheduler computes a "scheduling deadline"
|
||||
consistent with the guarantee (using the CBS[2,3] algorithm). Tasks are then
|
||||
scheduled using EDF[1] on these scheduling deadlines (the task with the
|
||||
smallest scheduling deadline is selected for execution). Notice that this
|
||||
guaranteed is respected if a proper "admission control" strategy (see Section
|
||||
"4. Bandwidth management") is used.
|
||||
|
||||
Summing up, the CBS[2,3] algorithms assigns scheduling deadlines to tasks so
|
||||
that each task runs for at most its runtime every period, avoiding any
|
||||
interference between different tasks (bandwidth isolation), while the EDF[1]
|
||||
algorithm selects the task with the smallest scheduling deadline as the one
|
||||
to be executed first. Thanks to this feature, also tasks that do not
|
||||
strictly comply with the "traditional" real-time task model (see Section 3)
|
||||
can effectively use the new policy.
|
||||
|
||||
In more details, the CBS algorithm assigns scheduling deadlines to
|
||||
tasks in the following way:
|
||||
|
||||
- Each SCHED_DEADLINE task is characterised by the "runtime",
|
||||
"deadline", and "period" parameters;
|
||||
|
||||
- The state of the task is described by a "scheduling deadline", and
|
||||
a "current runtime". These two parameters are initially set to 0;
|
||||
|
||||
- When a SCHED_DEADLINE task wakes up (becomes ready for execution),
|
||||
the scheduler checks if
|
||||
|
||||
current runtime runtime
|
||||
---------------------------------- > ----------------
|
||||
scheduling deadline - current time period
|
||||
|
||||
then, if the scheduling deadline is smaller than the current time, or
|
||||
this condition is verified, the scheduling deadline and the
|
||||
current budget are re-initialised as
|
||||
|
||||
scheduling deadline = current time + deadline
|
||||
current runtime = runtime
|
||||
|
||||
otherwise, the scheduling deadline and the current runtime are
|
||||
left unchanged;
|
||||
|
||||
- When a SCHED_DEADLINE task executes for an amount of time t, its
|
||||
current runtime is decreased as
|
||||
|
||||
current runtime = current runtime - t
|
||||
|
||||
(technically, the runtime is decreased at every tick, or when the
|
||||
task is descheduled / preempted);
|
||||
|
||||
- When the current runtime becomes less or equal than 0, the task is
|
||||
said to be "throttled" (also known as "depleted" in real-time literature)
|
||||
and cannot be scheduled until its scheduling deadline. The "replenishment
|
||||
time" for this task (see next item) is set to be equal to the current
|
||||
value of the scheduling deadline;
|
||||
|
||||
- When the current time is equal to the replenishment time of a
|
||||
throttled task, the scheduling deadline and the current runtime are
|
||||
updated as
|
||||
|
||||
scheduling deadline = scheduling deadline + period
|
||||
current runtime = current runtime + runtime
|
||||
|
||||
|
||||
3. Scheduling Real-Time Tasks
|
||||
=============================
|
||||
|
||||
* BIG FAT WARNING ******************************************************
|
||||
*
|
||||
* This section contains a (not-thorough) summary on classical deadline
|
||||
* scheduling theory, and how it applies to SCHED_DEADLINE.
|
||||
* The reader can "safely" skip to Section 4 if only interested in seeing
|
||||
* how the scheduling policy can be used. Anyway, we strongly recommend
|
||||
* to come back here and continue reading (once the urge for testing is
|
||||
* satisfied :P) to be sure of fully understanding all technical details.
|
||||
************************************************************************
|
||||
|
||||
There are no limitations on what kind of task can exploit this new
|
||||
scheduling discipline, even if it must be said that it is particularly
|
||||
suited for periodic or sporadic real-time tasks that need guarantees on their
|
||||
timing behavior, e.g., multimedia, streaming, control applications, etc.
|
||||
|
||||
A typical real-time task is composed of a repetition of computation phases
|
||||
(task instances, or jobs) which are activated on a periodic or sporadic
|
||||
fashion.
|
||||
Each job J_j (where J_j is the j^th job of the task) is characterised by an
|
||||
arrival time r_j (the time when the job starts), an amount of computation
|
||||
time c_j needed to finish the job, and a job absolute deadline d_j, which
|
||||
is the time within which the job should be finished. The maximum execution
|
||||
time max_j{c_j} is called "Worst Case Execution Time" (WCET) for the task.
|
||||
A real-time task can be periodic with period P if r_{j+1} = r_j + P, or
|
||||
sporadic with minimum inter-arrival time P is r_{j+1} >= r_j + P. Finally,
|
||||
d_j = r_j + D, where D is the task's relative deadline.
|
||||
|
||||
SCHED_DEADLINE can be used to schedule real-time tasks guaranteeing that
|
||||
the jobs' deadlines of a task are respected. In order to do this, a task
|
||||
must be scheduled by setting:
|
||||
|
||||
- runtime >= WCET
|
||||
- deadline = D
|
||||
- period <= P
|
||||
|
||||
IOW, if runtime >= WCET and if period is >= P, then the scheduling deadlines
|
||||
and the absolute deadlines (d_j) coincide, so a proper admission control
|
||||
allows to respect the jobs' absolute deadlines for this task (this is what is
|
||||
called "hard schedulability property" and is an extension of Lemma 1 of [2]).
|
||||
|
||||
References:
|
||||
1 - C. L. Liu and J. W. Layland. Scheduling algorithms for multiprogram-
|
||||
ming in a hard-real-time environment. Journal of the Association for
|
||||
Computing Machinery, 20(1), 1973.
|
||||
2 - L. Abeni , G. Buttazzo. Integrating Multimedia Applications in Hard
|
||||
Real-Time Systems. Proceedings of the 19th IEEE Real-time Systems
|
||||
Symposium, 1998. http://retis.sssup.it/~giorgio/paps/1998/rtss98-cbs.pdf
|
||||
3 - L. Abeni. Server Mechanisms for Multimedia Applications. ReTiS Lab
|
||||
Technical Report. http://xoomer.virgilio.it/lucabe72/pubs/tr-98-01.ps
|
||||
|
||||
4. Bandwidth management
|
||||
=======================
|
||||
|
||||
In order for the -deadline scheduling to be effective and useful, it is
|
||||
important to have some method to keep the allocation of the available CPU
|
||||
bandwidth to the tasks under control.
|
||||
This is usually called "admission control" and if it is not performed at all,
|
||||
no guarantee can be given on the actual scheduling of the -deadline tasks.
|
||||
|
||||
Since when RT-throttling has been introduced each task group has a bandwidth
|
||||
associated, calculated as a certain amount of runtime over a period.
|
||||
Moreover, to make it possible to manipulate such bandwidth, readable/writable
|
||||
controls have been added to both procfs (for system wide settings) and cgroupfs
|
||||
(for per-group settings).
|
||||
Therefore, the same interface is being used for controlling the bandwidth
|
||||
distrubution to -deadline tasks.
|
||||
|
||||
However, more discussion is needed in order to figure out how we want to manage
|
||||
SCHED_DEADLINE bandwidth at the task group level. Therefore, SCHED_DEADLINE
|
||||
uses (for now) a less sophisticated, but actually very sensible, mechanism to
|
||||
ensure that a certain utilization cap is not overcome per each root_domain.
|
||||
|
||||
Another main difference between deadline bandwidth management and RT-throttling
|
||||
is that -deadline tasks have bandwidth on their own (while -rt ones don't!),
|
||||
and thus we don't need an higher level throttling mechanism to enforce the
|
||||
desired bandwidth.
|
||||
|
||||
4.1 System wide settings
|
||||
------------------------
|
||||
|
||||
The system wide settings are configured under the /proc virtual file system.
|
||||
|
||||
For now the -rt knobs are used for dl admission control and the -deadline
|
||||
runtime is accounted against the -rt runtime. We realise that this isn't
|
||||
entirely desirable; however, it is better to have a small interface for now,
|
||||
and be able to change it easily later. The ideal situation (see 5.) is to run
|
||||
-rt tasks from a -deadline server; in which case the -rt bandwidth is a direct
|
||||
subset of dl_bw.
|
||||
|
||||
This means that, for a root_domain comprising M CPUs, -deadline tasks
|
||||
can be created while the sum of their bandwidths stays below:
|
||||
|
||||
M * (sched_rt_runtime_us / sched_rt_period_us)
|
||||
|
||||
It is also possible to disable this bandwidth management logic, and
|
||||
be thus free of oversubscribing the system up to any arbitrary level.
|
||||
This is done by writing -1 in /proc/sys/kernel/sched_rt_runtime_us.
|
||||
|
||||
|
||||
4.2 Task interface
|
||||
------------------
|
||||
|
||||
Specifying a periodic/sporadic task that executes for a given amount of
|
||||
runtime at each instance, and that is scheduled according to the urgency of
|
||||
its own timing constraints needs, in general, a way of declaring:
|
||||
- a (maximum/typical) instance execution time,
|
||||
- a minimum interval between consecutive instances,
|
||||
- a time constraint by which each instance must be completed.
|
||||
|
||||
Therefore:
|
||||
* a new struct sched_attr, containing all the necessary fields is
|
||||
provided;
|
||||
* the new scheduling related syscalls that manipulate it, i.e.,
|
||||
sched_setattr() and sched_getattr() are implemented.
|
||||
|
||||
|
||||
4.3 Default behavior
|
||||
---------------------
|
||||
|
||||
The default value for SCHED_DEADLINE bandwidth is to have rt_runtime equal to
|
||||
950000. With rt_period equal to 1000000, by default, it means that -deadline
|
||||
tasks can use at most 95%, multiplied by the number of CPUs that compose the
|
||||
root_domain, for each root_domain.
|
||||
|
||||
A -deadline task cannot fork.
|
||||
|
||||
5. Tasks CPU affinity
|
||||
=====================
|
||||
|
||||
-deadline tasks cannot have an affinity mask smaller that the entire
|
||||
root_domain they are created on. However, affinities can be specified
|
||||
through the cpuset facility (Documentation/cgroups/cpusets.txt).
|
||||
|
||||
5.1 SCHED_DEADLINE and cpusets HOWTO
|
||||
------------------------------------
|
||||
|
||||
An example of a simple configuration (pin a -deadline task to CPU0)
|
||||
follows (rt-app is used to create a -deadline task).
|
||||
|
||||
mkdir /dev/cpuset
|
||||
mount -t cgroup -o cpuset cpuset /dev/cpuset
|
||||
cd /dev/cpuset
|
||||
mkdir cpu0
|
||||
echo 0 > cpu0/cpuset.cpus
|
||||
echo 0 > cpu0/cpuset.mems
|
||||
echo 1 > cpuset.cpu_exclusive
|
||||
echo 0 > cpuset.sched_load_balance
|
||||
echo 1 > cpu0/cpuset.cpu_exclusive
|
||||
echo 1 > cpu0/cpuset.mem_exclusive
|
||||
echo $$ > cpu0/tasks
|
||||
rt-app -t 100000:10000:d:0 -D5 (it is now actually superfluous to specify
|
||||
task affinity)
|
||||
|
||||
6. Future plans
|
||||
===============
|
||||
|
||||
Still missing:
|
||||
|
||||
- refinements to deadline inheritance, especially regarding the possibility
|
||||
of retaining bandwidth isolation among non-interacting tasks. This is
|
||||
being studied from both theoretical and practical points of view, and
|
||||
hopefully we should be able to produce some demonstrative code soon;
|
||||
- (c)group based bandwidth management, and maybe scheduling;
|
||||
- access control for non-root users (and related security concerns to
|
||||
address), which is the best way to allow unprivileged use of the mechanisms
|
||||
and how to prevent non-root users "cheat" the system?
|
||||
|
||||
As already discussed, we are planning also to merge this work with the EDF
|
||||
throttling patches [https://lkml.org/lkml/2010/2/23/239] but we still are in
|
||||
the preliminary phases of the merge and we really seek feedback that would
|
||||
help us decide on the direction it should take.
|
@ -351,7 +351,8 @@ static void replenish_dl_entity(struct sched_dl_entity *dl_se,
|
||||
* disrupting the schedulability of the system. Otherwise, we should
|
||||
* refill the runtime and set the deadline a period in the future,
|
||||
* because keeping the current (absolute) deadline of the task would
|
||||
* result in breaking guarantees promised to other tasks.
|
||||
* result in breaking guarantees promised to other tasks (refer to
|
||||
* Documentation/scheduler/sched-deadline.txt for more informations).
|
||||
*
|
||||
* This function returns true if:
|
||||
*
|
||||
|
Loading…
Reference in New Issue
Block a user