When receiving HCI Phylink Complete event run amp_physical_cfm
which initialize BR/EDR L2CAP channel associated with High Speed
link and run l2cap_physical_cfm which shall send L2CAP Create
Chan Request.
Signed-off-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
Disconnect logical link for high speed channel hs_hchan
associated with L2CAP channel chan.
Signed-off-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
After physical link is created logical link needs to be created.
The process starts after L2CAP channel is created and L2CAP
Configuration Response with result PENDING is received.
Signed-off-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
Add direction parameter to phylink_add since it is anyway set later.
Signed-off-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
Add ctrl_id parameter to amp_ctrl_add since we always set it
after function ctrl is created.
Signed-off-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
When receiving HCI Command Status event for Accept Physical Link
execute HCI Write Remote AMP Assoc with data saved from A2MP Create
Physical Link Request.
Signed-off-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
When receiving A2MP Create Physical Link message execute HCI
Accept Physical Link command to AMP controller.
Signed-off-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
Channel Selected event indicates that link information data is available.
Read it with Read Local AMP Assoc command. The data shall be sent in the
A2MP Create Physical Link Request.
Signed-off-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
When receiving HCI Command Status after HCI Create Physical Link
execute HCI Write Remote AMP Assoc command to AMP controller.
Signed-off-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
When receiving A2MP Get AMP Assoc Response execute HCI Create Physical
Link to AMP controller. Define function which will run when receiving
HCI Command Status.
Signed-off-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
Function calculates AMP keys using hmac_sha256 helper. Calculated keys
are Generic AMP Link Key (gamp) and Dedicated AMP Link Key with
keyID "802b" for 802.11 PAL.
Signed-off-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
Create remote AMP controllers structure. It is used to keep information
about discovered remote AMP controllers by A2MP protocol.
Signed-off-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
Define physical link structures. Physical links are represented by
hci_conn structure. For BR/EDR we use type ACL_LINK and for AMP
we use AMP_LINK.
Signed-off-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
When receiving A2MP Get AMP Assoc Request execute Read Local AMP Assoc
HCI command to AMP controller. If the AMP Assoc data is larger than it
can fit to HCI event only fragment is read. When all fragments are read
send A2MP Get AMP Assoc Response.
Signed-off-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>