mirror of
https://github.com/FEX-Emu/linux.git
synced 2025-01-10 11:30:49 +00:00
c0e5ddab6e
By accident this level has been removed by the NUMA infrastructure patch.
For non-NUMA systems with CPUs that span more than one book, this makes
the scheduler only use one of the books and the other books remain idle.
Fix this and re-add the missing level.
For NUMA and non-NUMA we have the following scheduling domains and groups:
- SMT (Groups: CPU threads)
- MC (Groups: Cores)
- BOOK (Groups: Books)
For the non-NUMA case we have one last level scheduling domain:
- DIE (Groups: Whole system, has all CPUs -> cpu_cpu_mask)
For the NUMA case we have the following two last level scheduling domains:
- DIE (Groups: NUMA nodes -> cpu_cpu_mask -> returns node siblings)
- NUMA (Groups: Whole system, has all CPUs -> created in sched_init_numa())
Fixes:
|
||
---|---|---|
.. | ||
appldata | ||
boot | ||
configs | ||
crypto | ||
hypfs | ||
include | ||
kernel | ||
kvm | ||
lib | ||
mm | ||
net | ||
numa | ||
oprofile | ||
pci | ||
defconfig | ||
Kbuild | ||
Kconfig | ||
Kconfig.debug | ||
Makefile |