[PR #691] [MERGED] Omit Phosphor-icons ssr icons from build #3456

Closed
opened 2026-02-22 18:33:49 -05:00 by yindo · 0 comments
Owner

📋 Pull Request Information

Original PR: https://github.com/Mintplex-Labs/anything-llm/pull/691
Author: @timothycarambat
Created: 2/7/2024
Status: Merged
Merged: 2/7/2024
Merged by: @timothycarambat

Base: masterHead: remove-phosphor-ssr-from-build


📝 Commits (1)

  • 1baafd9 Omit Phosphor-icons ssr icons from build

📊 Changes

3 files changed (+9 additions, -9 deletions)

View changed files

📝 frontend/package.json (+3 -4)
📝 frontend/vite.config.js (+6 -0)
📝 frontend/yarn.lock (+0 -5)

📄 Description

move dev deps from prod build
remove unused deps

Pull Request Type

  • feat
  • 🐛 fix
  • ♻️ refactor
  • 💄 style
  • 🔨 chore
  • 📝 docs

What is in this change?

Reduces production build size of frontend for faster speed and chunking strategy

Additional Information

HighlightJS remains to be the largest chunk. We can do what we did with embed and only import a subset of languages we wish to support. Given this is a vite build for react we can include a larger subset then what is found in embed

Developer Validations

  • I ran yarn lint from the root of the repo & committed changes
  • Relevant documentation has been updated
  • I have tested my code functionality
  • Docker build succeeds locally

🔄 This issue represents a GitHub Pull Request. It cannot be merged through Gitea due to API limitations.

## 📋 Pull Request Information **Original PR:** https://github.com/Mintplex-Labs/anything-llm/pull/691 **Author:** [@timothycarambat](https://github.com/timothycarambat) **Created:** 2/7/2024 **Status:** ✅ Merged **Merged:** 2/7/2024 **Merged by:** [@timothycarambat](https://github.com/timothycarambat) **Base:** `master` ← **Head:** `remove-phosphor-ssr-from-build` --- ### 📝 Commits (1) - [`1baafd9`](https://github.com/Mintplex-Labs/anything-llm/commit/1baafd958c36299cf3967c669441aef517055b52) Omit Phosphor-icons ssr icons from build ### 📊 Changes **3 files changed** (+9 additions, -9 deletions) <details> <summary>View changed files</summary> 📝 `frontend/package.json` (+3 -4) 📝 `frontend/vite.config.js` (+6 -0) 📝 `frontend/yarn.lock` (+0 -5) </details> ### 📄 Description move dev deps from prod build remove unused deps ### Pull Request Type <!-- For change type, change [ ] to [x]. --> - [ ] ✨ feat - [ ] 🐛 fix - [x] ♻️ refactor - [ ] 💄 style - [ ] 🔨 chore - [ ] 📝 docs ### What is in this change? Reduces production build size of frontend for faster speed and chunking strategy ### Additional Information HighlightJS remains to be the largest chunk. We can do what we did with `embed` and only import a subset of languages we wish to support. Given this is a vite build for react we can include a larger subset then what is found in `embed` ### Developer Validations <!-- All of the applicable items should be checked. --> - [x] I ran `yarn lint` from the root of the repo & committed changes - [x] Relevant documentation has been updated - [x] I have tested my code functionality - [x] Docker build succeeds locally --- <sub>🔄 This issue represents a GitHub Pull Request. It cannot be merged through Gitea due to API limitations.</sub>
yindo added the pull-request label 2026-02-22 18:33:49 -05:00
yindo closed this issue 2026-02-22 18:33:49 -05:00
yindo changed title from [PR #691] Omit Phosphor-icons ssr icons from build to [PR #691] [MERGED] Omit Phosphor-icons ssr icons from build 2026-06-05 15:13:31 -04:00
Sign in to join this conversation.
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: Mintplex-Labs/anything-llm#3456