Files
qwen-code/docs
Shaojin WenandQwen-Coder 3663209c3d chore(ci): shorten stale PR window to 30 + 14 days (#16435)
* chore(ci): shorten stale PR window to 30 + 14 days

The open PR backlog keeps growing, and the 60 + 30 day window only reaches PRs inactive for two months, leaving the 30-60 day band untouched. Lower the stale threshold to 30 days and the close window to 14 days, and raise operations-per-run to 300 so the first sweep can label the backlog in one or two runs. The stale/close messages and the fleet-shepherd design docs are updated to match.

Co-authored-by: Qwen-Coder <[email protected]>

* docs: keep the stale-window reference in the design current

Avoid pinning the note to a merge-date guess: name the policy change instead, and reflow the paragraph to the file width.

Co-authored-by: Qwen-Coder <[email protected]>

---------

Co-authored-by: Qwen-Coder <[email protected]>
2026-11-06 14:43:07 +08:00
..
2025-12-05 10:51:57 +08:00
2025-12-19 15:52:11 +08:00