* test(managed-agent): close post-split verification gaps
Establish an active response before probing caller cancellation, retain close deadlines, run both independent embedding hosts from the full MySQL lane, and record post-merge acceptance boundaries.
Co-authored-by: Qwen-Coder <[email protected]>
* ci(managed-agent): keep embedding checks within workflow size gate
Move the existing embedding-host verification commands unchanged into a shell script so sdk-java.yml stays within the existing growth allowance. Extend the workflow guards to inspect the script and retain the test and cache-lock requirements.
Co-authored-by: Qwen-Coder <[email protected]>
* fix(cli): finish hosted settle budget call migration
Replace the 25 remaining references to the removed settle timeout constant with the existing per-test budget function. This repairs the TypeScript compilation failure exposed by the main merge while preserving the new shared deadline policy.
Co-authored-by: Qwen-Coder <[email protected]>
* fix(managed-agent): preserve Hosted fault checks after module split
Preserve the typed stream-idle failure and its duration across the SDK boundary. Update fault-injection fixtures for wrapped connectors and the verification module directory, and wait for the documented pending Items projection within the existing bounded poll.
Co-authored-by: Qwen-Coder <[email protected]>
---------
Co-authored-by: Qwen-Coder <[email protected]>